Austin, TX · Mon–Sat 8–4 · Text (512) 525-8304 For quotes: info@360metalwork.com

Project · Austin, TX

SoMa Top Bar Support

Commercial-grade steel beams for an open floor plan — shop-fabbed in four days.

South Manchaca, Austin

SoMa Top Bar Support

Commercial-grade steel beams for an open floor plan in South Manchaca. Shop-fabricated in four days and set for a semi-industrial look.

Hidden connections where the architecture allows; exposed steel where the design calls for it.

MaterialSteel
FinishExposed / satin black
LocationSouth Manchaca
Shop time4 days
SoMa top bar support steel beams
Structural steel · SoMa